Showing 112 results

Archivistische beschrijving
Ontario Construction With digital objects Engels
Print preview View:

William de Peuter Speaking at Ground-Breaking

Photograph of Mayor William de Peuter (with microphone) speaking at the ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988. Those with the mayor include MPP Bruce Owen, Eleanor Sherbo, Louise Evans and C.T.S. Evans

Zonder titel

William de Peuter and Bruce Owen

Photograph of Mayor William de Peuter and MPP Bruce Owen at the ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988.

Zonder titel

Volunteers & Staff at Library Groundbreaking

Photograph of staff & volunteers at ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988. Left to Right: Nellie Dewhurst (library volunteer), Flora Nydam (library staff), Anita Sikma (library staff), Marilyn Reynolds (library staff), Mrs. Charlotte Michna (patron of the library)

Village of Bradford Account Ledger

Bradford Account Ledger. Includes: Debentures, fire engine account, factory account, hydro-electric debentures, high school debentures, board of education account, Bradford & West Gwillimbury Drainage Scheme account , Bradford Drainage Scheme account and Holland Street paving account. Runs from early 1900s – 1930s. Has some items glued into it.

Zonder titel

Up And Away

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Zonder titel

Up And Away

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Zonder titel

Up And Away

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Zonder titel

Trucks Outside

Photograph of trucks outside the entrance from the construction of the library at its location on Holland Court. The view is from the street, looking toward east entrance.

Resultaten 1 tot 10 van 112