Mostrando 51 resultados

Descripción archivística
Bradford Construction Imagen Inglés
Imprimir vista previa Ver :

51 resultados con objetos digitales Muestra los resultados con objetos digitales

William de Peuter Speaking at Ground-Breaking

Photograph of Mayor William de Peuter (with microphone) speaking at the ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988. Those with the mayor include MPP Bruce Owen, Eleanor Sherbo, Louise Evans and C.T.S. Evans

Sin título

William de Peuter and Bruce Owen

Photograph of Mayor William de Peuter and MPP Bruce Owen at the ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988.

Sin título

Volunteers & Staff at Library Groundbreaking

Photograph of staff & volunteers at ground breaking ceremony in October of 1987 for the Bradford Public Library. That library finished construction in 1988. Left to Right: Nellie Dewhurst (library volunteer), Flora Nydam (library staff), Anita Sikma (library staff), Marilyn Reynolds (library staff), Mrs. Charlotte Michna (patron of the library)

Up And Away

  • CA BWGPL GJ-SB 74/75-2016-08-17-01
  • Unidad documental simple
  • 1974-08-21
  • Parte deGeorge Jackson fonds

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Sin título

Up And Away

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Sin título

Up And Away

  • CA BWGPL GJ-SB 74/75-2016-08-17-02
  • Unidad documental simple
  • 1974-08-21
  • Parte deGeorge Jackson fonds

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Sin título

Trucks Outside

  • CA BWGPL LHC-Libr-Construction-Const87/88-2018-08-24-04
  • Unidad documental simple
  • 1988-08-5
  • Parte deLocal History Collection

Photograph of trucks outside the entrance from the construction of the library at its location on Holland Court. The view is from the street, looking toward east entrance.

Township changes building bylaw

Zima building bylaw dispute - part eight Note: article was never concluded in this or next edition of the Bradford Witness - printing error

Sin título

Resultados 1 a 10 de 51