Showing 114 results

Archival description
Item Construction
Print preview View:

114 results with digital objects Show results with digital objects

Elusive bottom slows rail bridge

"Since last July, a 10-man construction crew from the Canadian National Railways has been installing a new railway trestle across the Holland River, on the boundry [sic] of Simcoe county and the Region of York. The new steel trestle will extend 275 feet across the river and sit 16 to 17 inches higher than the wooden bridge which the railroad is presently using." ... article explains the history of this bridge, and the difficulties of the new installation.

Bradford Witness

First Draft of Library Study Completed

"A new library for Bradford came one tiny step closer to reality last week when Fox Jones and Associates presented its first public report. The facility feasibility study, still in draft form, was presented at a public meeting last week (Aug 27). ..."

Bradford Weekly

First draft of library study completed

A newspaper article about building a new Bradford Public Library at 100 Holland Court.

"A new library for Bradford came one tiny step closer to reality last week when Fox Jones and Associates presented its first public report...If plans stay roughly on schedule, the consultants believe architectural proposals may be sought early this fall..."

Bradford Weekly

Job Site Discussion

Photograph from a job site meeting about the building of the Bradford Public Library. That library finished construction in 1988. The photo shows Bob of Gallagher Construction and Bob McIntyre of Lett/Smith.

Results 71 to 80 of 114