George Stoddart in hospital

"Mr. Geo. Stoddart, who is in the General Hospital, Toronto, continues in a very critical condition. Besides a broken leg other troubles of an inward nature have developed and the latest reports have not been encouraging."

Sin título

George Stoddart is getting better

"We are informed that Mr. Geo. Stoddart who met with an accident at our school house, and who is at the Toronto General Hospital, is able to move himself around in an easy chair."

Sin título

Village of Bradford Account Ledger

Bradford Account Ledger. Includes: Debentures, fire engine account, factory account, hydro-electric debentures, high school debentures, board of education account, Bradford & West Gwillimbury Drainage Scheme account , Bradford Drainage Scheme account and Holland Street paving account. Runs from early 1900s – 1930s. Has some items glued into it.

Sin título

British American Oil Company

  • CA BWGPL JH-2019-06-21-07
  • Unidad documental simple
  • 1918-02-20 - 1918-07-08
  • Parte deJohn Harrison Fonds

Correspondence and shipping documents between the Village of Bradford and The British American Oil Company.

Sin título

Bradford's New Post Office is Now Nearing Completion

  • CA BWGPL WEG-Post-2016-10-05-05
  • Unidad documental simple
  • 1936-06-03
  • Parte deWEGWHIST Collection

"Ready for Installation of Interior Fittings - Will Fill Long-Felt Need and Add Much to Appearance of Barrie Street and Business Section

Bradford's new Post Office building, construction of which was started late last fall, is now completed, inside and out, with the exception of the installing of interior fittings, the contract for which was let some time ago.
The new building, besides filling a long-felt need in this thriving and progressive village of over 1,000 population, is a most attractive addition to Bradford's business section. ..."

Sin título

New Post Office Contract Awarded to Weston Firm - Completion in Ten Months

  • CA BWGPL WEG-Post-2017-04-10-10
  • Unidad documental simple
  • 1964-08-12
  • Parte deWEGWHIST Collection

"OTTAWA, Aug 5-The Honourable Jean-Paul Deschatelets, Minister of Public works, today announced the award of a $101,600 contract to the Gorsline Construction Limited of Weston, Ont., for the construction of a Federal Building at Bradford, Ont.
The firm was the successful bidder of four in response to advertising for public tenders which closed on June 10, 1964. The highest bid was $106, 396. The work is scheduled for completion in 10 months.
The one storey building, measuring 72 feet by 62 feet, will be located on the northwest corner of John and Barrie Streets. It will be of concrete and steel construction with an exterior finished in brick and the base covered with Canadian granite. The main entrance canopy will be of reinforced concrete and steel construction.
The interior partition will be of masonry construction and the finished will include plaster, terrazzo, ceramic tile, acoustic tile ceilings and linoleum floor covering.
The windows will be sealed, double glazed units, installed in aluminum frames. Lighting will be fluorescent and heating will be from a gas fired hot water system.
The parking area at the rear and side will be asphalt covered, while the north, west and south boundary lines will be closed in with a chain link fence.
Accommodation will be provided for the Post Office Department and the Department of Agriculture.
Plans and specifications were prepared in the Toronto District Architect's Office of the Department of Public Works. I.M. Saunders, District Architect of Toronto, Ont., will be responsible for supervision of the work."

Sin título

Elusive bottom slows rail bridge

"Since last July, a 10-man construction crew from the Canadian National Railways has been installing a new railway trestle across the Holland River, on the boundry [sic] of Simcoe county and the Region of York. The new steel trestle will extend 275 feet across the river and sit 16 to 17 inches higher than the wooden bridge which the railroad is presently using." ... article explains the history of this bridge, and the difficulties of the new installation.

Sin título