Town Gives Gift

A newspaper article about a town donation to the building fund for the Bradford Public Library at 100 Holland Court.

"BRADFORD - The Bradford Public Library BOard received a big boost to the coffers last week. Town council made official a donation that is valued at close to half a million dollars. The grant and land deal is to be used for the construction of the new library..."

Zonder titel

Architect unveils plans for library

A newspaper article about the architectural plans for the building of a new Bradford Public Library at 100 Holland Court.

"Plans for Bradford's new $1.2 million library were unveiled Monday night. Architect Bill Lett presented a model and blueprints for the interior of the building, which were hashed out b the library committee...Lamb said the model of the library should help volunteers raise funds. 'When people throw their nickles, their quarters and their $250 in the jar, they can see what they're going to get' he said."

Zonder titel

Architect for library chosen

A newspaper article about the architect being chosen for the new Bradford Public Library at 100 Holland Court.

"Another step in the long process to getting a new library was passed last week, as council and the library board approved an architect to design the new building. The contract was awarded to Lett/Smith Architects of Toronto, it was announced at a special joint council-library board meeting on Monday..."

Zonder titel

Bridge should be replaced, Bradford engineer says

Article featuring Ernst Heinrichs, engineer, and his proposal to the town council on the Holland River bridge's replacement needs. At the time, the bridge was 34 years old and had shifted two feet from its original position.

Zonder titel

Contradictions

"The building permit 74-104 was issued to John Zima on September 11. Township building inspector, Bert Magloughlen posted a stop work order on the Simcoe Rd. building site on September 16. Workmen continued blocklaying in the face of the stop work order. Mr. Zima believes his building permit was and is valid and Mr. Magloughlen believes he has revoked the permit. A decision on who is right will probably come through the courts."

Zonder titel

Village of Bradford Account Ledger

Bradford Account Ledger. Includes: Debentures, fire engine account, factory account, hydro-electric debentures, high school debentures, board of education account, Bradford & West Gwillimbury Drainage Scheme account , Bradford Drainage Scheme account and Holland Street paving account. Runs from early 1900s – 1930s. Has some items glued into it.

Zonder titel

New Post Office Contract Awarded to Weston Firm - Completion in Ten Months

"OTTAWA, Aug 5-The Honourable Jean-Paul Deschatelets, Minister of Public works, today announced the award of a $101,600 contract to the Gorsline Construction Limited of Weston, Ont., for the construction of a Federal Building at Bradford, Ont.
The firm was the successful bidder of four in response to advertising for public tenders which closed on June 10, 1964. The highest bid was $106, 396. The work is scheduled for completion in 10 months.
The one storey building, measuring 72 feet by 62 feet, will be located on the northwest corner of John and Barrie Streets. It will be of concrete and steel construction with an exterior finished in brick and the base covered with Canadian granite. The main entrance canopy will be of reinforced concrete and steel construction.
The interior partition will be of masonry construction and the finished will include plaster, terrazzo, ceramic tile, acoustic tile ceilings and linoleum floor covering.
The windows will be sealed, double glazed units, installed in aluminum frames. Lighting will be fluorescent and heating will be from a gas fired hot water system.
The parking area at the rear and side will be asphalt covered, while the north, west and south boundary lines will be closed in with a chain link fence.
Accommodation will be provided for the Post Office Department and the Department of Agriculture.
Plans and specifications were prepared in the Toronto District Architect's Office of the Department of Public Works. I.M. Saunders, District Architect of Toronto, Ont., will be responsible for supervision of the work."

Zonder titel

Construction

The Holland Court Bradford Public Library under construction.

Bradford Public Library Job Meeting

Photograph from a job site meeting about the building of the Bradford Public Library. That library finished construction in 1988. The photo shows Bob & Kevin Gallagher of Gallagher Construction.

Job Site Discussion

Photograph from a job site meeting about the building of the Bradford Public Library. That library finished construction in 1988. The photo shows Bob of Gallagher Construction and Bob McIntyre of Lett/Smith.