Showing 55 results

Archival description
Bradford West Gwillimbury Construction With digital objects
Print preview View:

Trinity Auction fever

"Every year, Bradford's Trinity Anglican Church holds the largest charity auction in Bradford West Gwillimbury.
Items up for bids range from the sublime - a diamond ring, donated by Universal Gems; a hot air balloon ride donated by Hugh Adams - to the downright silly. Last year, under the direction of auctioneer Allen Homer, bidding was fierce for the right to shave off the beards of two hirsute volunteers.
This year, the event will be raising funds to install a handicapped access ramp and an elevator at the church.
The auction takes place Friday, May 13th, 7:30 p.m. at the Bradford Arena. There is no admission charge. Refreshments can be purchased."

Bradford West Gwillimbury Times

Trinity Auction: Baa baa bidding

"Item 58 may have been bidding on himself. One of the more interesting items up for grabs at the Trinity Anglican Church auction, a pet lamb, made more noise than a table full of bidders on Friday night.
The yearly auction, held to raise money for the planned addition to the church, featured 155 items ranging from peanut butter cookies to a hot-air balloon ride. A smart bidder could have walked away from the evening never having to mow a lawn or make dinner ever again.
Local auctioneer Allen Homer kept the crowd's attention with his unique mix of humor and quick-paced auctionese. Homer donates his time each year to help the church raise funds.
Plans for the addition include an elevator, a handicapped washroom and parking spaces, outdoor ramps and a parson's study."

Bradford West Gwillimbury Times

Trinity Anglican sod-breaking ceremony: new handicap access

"Bradford West Gwillimbury Mayor Pat Storey (with shovel) helps to turn the sod at trinity Anglican Church in Bradford. Sod-breaking ceremony, for new addition & handicap access, took place Sunday."

Bradford West Gwillimbury Times

Proposal for $11.6 million Admin Centre

A 30,000 sq. ft. Administration Building, with a Council Chamber that could double as an Arts Center. A 14,000 sq. ft. South Simcoe Police Station, that shares an atrium-style public entry with the Administration building. A separate courthouse - and possibly, an Ambulance station. All of it to be paid for through development charges, reserve funds from the sale of the municipal electrical utility, contributions from the County of Simcoe, and the sale of surplus properties - with no impact on the tax rate. ...

Bradford West Gwillimbury Times

Lots of activity on the site

An article about construction of the new library at 425 Holland Street West.

"Garry Pilon, principal of Salter Pilon + Lett Architects, provided an update on the new BWG REcreation complex and Library: 'There's lots of activity on that site...It's progressing well and on schedule.' Since September 1, excavation and grading have been underway on the 'campus lands' site - 21 acres fronting on Holland St. W., just west of Bradford District High School..."

Bradford West Gwillimbury Times

Construction Visitors

Back row: John Gabriel, ..., Don Harrison, Art Janse, Dave Eek, ..., Ron Kneeshaw
Front row: ..., Ted Mendrek, James Church, Ken Smart.

Bradford West Gwillimbury Public Library

Church-raising project

"Rev. Phillip Carroll, Pastor at the Bradford Pentecostal Assembly just North of Town, is getting tired of crawling under buildings to unfreeze water pipes.
With that as an incentive, and a growing flock of parishioners to contend with, a unique building project is set to begin at the end of March. For five weeks, volunteer workers from across the province will give up their vacation time to help construct a new church, replacing the two small portable structures at the South-east corner of Highway 11 and the 9th Concession.
Each week, the Bradford Pentecostal Assembly holds services for 40 to 60 people in an area no bigger than a primary school classroom. A cold winter helped convince Carroll of the need for larger, modern facilities. The present building "just isn't meeting our needs," he said.
The Church building project is being organized under the auspices of the Pentecostal Assemblies of Canada. Plans are now in the final stages of preparation, and onl;y a few building permits and a fire code inspection remain as hurdles, before the ceremonial ground-breaking two weeks from now.
The new church will have seating for 170, and a full basement with kitchen facilities and classrooms. Carroll estimates the building will cost about $175,000, less than half what it would cost using a more traditional method of construction.
A similar project in Smooth Rock Falls, Ontario, was accomplished in just under two months, and Carroll is sure things will work out in Bradford.
"It's going to be very inspiring to watch...the building rise" "

Bradford West Gwillimbury Times

BWGPL Construction - Sept 17, 2009 - Image Two

Photograph of the construction process of the Bradford West Gwillimbury Library at 425 Holland Street W., Bradford, Ontario. Image of the beginning phases of construction. Image taken on September 17th, 2009.

Heidi Northover

Results 1 to 10 of 55