Dyke construction to cost $1.6-million

"Protecting the Holland Marsh from another Hurricane Hazel will cost at least $1.6-million, according to figures released by the South Lake Simcoe Conservation Authority...."
The Marsh fears its dykes will not hold off another flood if a big storm hits, 25 years after Hurricane Hazel.

Sin título

Up And Away

  • CA BWGPL GJ-SB 74/75-2016-08-17-01
  • Unidad documental simple
  • 1974-08-21
  • Parte deGeorge Jackson fonds

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Sin título

Up And Away

  • CA BWGPL GJ-SB 74/75-2016-08-17-02
  • Unidad documental simple
  • 1974-08-21
  • Parte deGeorge Jackson fonds

"It was up, up and away at Bak's Market on Wednesday, August 21 when the windmill on top of the market was completed. The job of lifting the blades up to the steel stand took only minutes after workmen finished putting the finishing touches on them. (right) The cost of the whole windmill is roughly $15,000 according to proprietor Casey Bak. The blades and shaft alone weigh two tons and will turn at one and a half revolutions per minute when the drive motor is installed."

Sin título

Resultados 1 a 10 de 132