- CA BWGPL JS-Vol3-JSC-v3-1830
- Pièce
Fait partie de Joe Saint fonds
Contains clippings and photographs of Bradford West Gwillimbury's transportation methods
Sans titre
24 résultats directement liés Exclure les termes spécifiques
Fait partie de Joe Saint fonds
Contains clippings and photographs of Bradford West Gwillimbury's transportation methods
Sans titre
Fait partie de Joe Saint fonds
Contains news clippings and articles on various disastrous events of Bradford West Gwillimbury; includes fires, Hurricane Hazel, drownings, explosion, train wrecks
Sans titre
Fait partie de Local History Collection
Fait partie de Local History Collection
A train wreck occurred on the Grand Trunk Railway on July 15, 1908 between Bradford and Gilford.
Sans titre
Fait partie de Local History Collection
"Serious smashup on the G.T. R. North of Bradford - Engineer, Fireman and Express Messenger Badly Injured"
Relates to the Grand Trunk Railway derailment on July 15, 1908.
Sans titre
Fait partie de Local History Collection
"The Inquest at Barrie was not concluded. - Evidence of Engineer Meeking and the Report of the Official Investigation Required--Cause of the Accident Not Clear"
Relates to the Grand Trunk Railway derailment on July 15, 1908
Sans titre
Fait partie de Local History Collection
"Return Open Verdict in Accident Which Caused Fireman's Death"
Relates to the Grand Trunk Railway derailment on July 15, 1908
Sans titre
Fait partie de Local History Collection
Train wreck on the Grand Trunk Railway between Bradford and Gilford July 15, 1908, a result of making up time.
Sans titre
Holland Landing freight shed fire
Fait partie de Local History Collection
"The G.T.R. freight sheds at Holland Landing narrowly escaped being consumed by fire at 12 o'clock on Saturday [April 29th]. After doing about $100 damage to the roof the fire got under control. The fire is supposed to have been caused by a passing locomotive."
Sans titre
Fait partie de Local History Collection
"The management of the Grand Trunk Railway system has issued instructions making effective on April 1st, increase in the rate of pay to section foremen on the lines in Canada at ten cents per day to all track laborers who are receiving one dollar per day. This increase will affect a large majority of section men on this portion of the Grand Trunk system."
Sans titre