Identity area
Reference code
CA BWGPL LHC-Tpor-2016-12-14-01
Title
Elusive bottom slows rail bridge
Date(s)
- 1974-01-23 (Creation)
Level of description
Item
Extent and medium
Newspaper article
Context area
Name of creator
Biographical history
Name of creator
Biographical history
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
"Since last July, a 10-man construction crew from the Canadian National Railways has been installing a new railway trestle across the Holland River, on the boundry [sic] of Simcoe county and the Region of York. The new steel trestle will extend 275 feet across the river and sit 16 to 17 inches higher than the wooden bridge which the railroad is presently using." ... article explains the history of this bridge, and the difficulties of the new installation.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
- English
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Bradford Witness
January 23, 1974
Vol 109, No. 4
Pg 5
Microfilm Reel #87
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Alternative identifier(s)
Access points
Subject access points
Place access points
Name access points
- E. Hall (Subject)
- Harvey Cleaveley (Subject)
- Pat Murphy (Subject)