Zone d'identification
Cote
CA BWGPL LHC-Tpor-2016-12-14-01
Titre
Elusive bottom slows rail bridge
Date(s)
- 1974-01-23 (Production)
Niveau de description
Pièce
Étendue matérielle et support
Newspaper article
Zone du contexte
Nom du producteur
Notice biographique
Nom du producteur
Notice biographique
Dépôt
Histoire archivistique
Source immédiate d'acquisition ou de transfert
Zone du contenu et de la structure
Portée et contenu
"Since last July, a 10-man construction crew from the Canadian National Railways has been installing a new railway trestle across the Holland River, on the boundry [sic] of Simcoe county and the Region of York. The new steel trestle will extend 275 feet across the river and sit 16 to 17 inches higher than the wooden bridge which the railroad is presently using." ... article explains the history of this bridge, and the difficulties of the new installation.
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Zone des conditions d'accès et d'utilisation
Conditions d'accès
Conditions de reproduction
Langue des documents
anglais
Écriture des documents
Notes de langue et graphie
Caractéristiques matérielle et contraintes techniques
Instruments de recherche
Bradford Witness
January 23, 1974
Vol 109, No. 4
Pg 5
Microfilm Reel #87
Zone des sources complémentaires
Existence et lieu de conservation des originaux
Existence et lieu de conservation des copies
Unités de description associées
Zone des notes
Identifiant(s) alternatif(s)
Mots-clés
Mots-clés - Sujets
Mots-clés - Lieux
Mots-clés - Noms
- Sans titre (Sujet)
- Sans titre (Sujet)
- Sans titre (Sujet)